VECYRA documentation ships with the beta build and is being published here progressively through the beta period. Start with the concepts — the governed model changes how every module behaves — then go module by module.
Get the Windows beta build, sign into the beta program, and launch with the sample project.
Download →The core concepts: one project model, objects and provenance, validation, and the audit trail.
Product overview →What changed in each beta build — new capabilities, fixes, and known issues.
Changelog →Bring a Primavera P6 schedule (v5–v8 exports) into the model, map fields, and review validation findings on arrival.
Planning module →Set the data date, enter progress, review earned value, and close the period with a snapshot.
Control module →Export structured Excel, edit it, and bring it back through diff, validate, and publish.
Smart Workbook →Run QSRA Monte Carlo simulation on the network and read the completion distribution — labeled as simulation.
Analysis module →Link delay events, records, and notices into a claim case with traceable provenance on every exhibit.
Commercial module →Snapshot the period, assemble the pack, preflight the figures, and publish with history.
Reporter module →In-depth references for the CPM engine, calendar model, validation rule set, and Smart Workbook sheet schemas are distributed with beta builds and will be published here as they stabilize during the beta period.
While the reference docs stabilize, beta participants get direct support: email us with your question and we'll walk you through it on your own data.