Modules

Buy the discipline you need. The governed model comes with it.

Each module is a complete professional workspace, priced per user per month on annual billing. Core — the governed project model, knowledge graph, validation, and audit trail — is included with any module.

VECYRA — Planning
VECYRA Planning: Gantt and activity grid with critical path on a sample project

Planning

$89 / user / mo
Schedule & CPM

The authoring workspace for the schedule: scope, structure, logic, and calendars — computed by the deterministic CPM engine and validated before it can be baselined.

  • Scope & structure: WBS, BOQ, and activity definition in one governed hierarchy
  • Calendars & logic: first-class calendars, relationships, constraints, and data-date control
  • Resources: resource and quantity loading tied to activities
  • Baseline: publish a baseline and measure every revision against it

Control

$79 / user / mo
EVM & performance

The monitoring cycle made routine: progress entry, lookaheads, earned value, and period close — all against the live schedule, all auditable.

  • Monitoring cycle: structured progress entry with data-date discipline
  • Lookahead: short-interval planning driven by the current network
  • EVM: planned value, earned value, actuals, and performance indices by period
  • Actuals & productivity: resource actuals and productivity measurement
  • Engineering & procurement: deliverable and package progress in the same model
VECYRA — Control
VECYRA Control: earned value metrics and period status on a sample project

Analysis

$99 / user / mo
Risk & forensic

The diagnostic layer: understand variance before it becomes delay, quantify schedule risk, test recovery options, and reconstruct what actually happened.

  • Variance: schedule and performance variance diagnosis against baseline
  • QSRA: quantitative schedule risk analysis with Monte Carlo simulation — labeled as simulation
  • Forecast & scenarios: what-if scenarios with recovery-path comparison
  • Forensic: retrospective delay analysis over versioned schedule revisions

Commercial

$119 / user / mo
Claims & change

Contract administration on the same evidence the schedule already holds: obligations, deadlines, change, delay events, EOT, and claims — assembled, not reconstructed.

  • Contract register: obligations, notices, and contractual deadlines tracked against the model
  • Change: change events with status and valuation
  • Delay & EOT: delay events linked to activities, supporting extension-of-time cases
  • Claims: claim cases built from linked evidence with traceable provenance
VECYRA — Commercial
VECYRA Commercial: claim register and claim case on a sample project

Systems & Commissioning

$89 / user / mo
Completion & turnover

Systems completion aligned to the delivery schedule: from system breakdown through testing and energization to turnover.

  • Systems & assets: system and asset breakdown tagged to schedule scope
  • Interfaces: interface points between systems made explicit and tracked
  • Tests: test planning and results against systems
  • Energization & turnover: sequence energization and assemble turnover readiness

Reporter

$59 / user / mo
Packs & deliverables

Reporting that publishes from the model, not from spreadsheets: snapshot the period, assemble the pack, preflight it, publish it.

  • Snapshot reports: period snapshots so the report and the data cannot drift apart
  • Packs: assemble recurring report packs from governed content
  • Preflight: checks before publication so broken figures never ship
  • Publish: controlled publication with history
VECYRA — Reporter
VECYRA Reporter: deliverable register with live model preview on a sample project

Core — the governed project model

One governed object model shared by every module, with object-centric traceability and provenance, the knowledge graph, the validation engine with explainable findings, the deterministic calendar-aware CPM engine, genuine XER import, and the append-only audit trail. It is the substrate every module runs on.

Included with any module
All of it

Need more than two modules? Take the Suite.

All six modules with Core, $399 per user per month, billed annually — less than the price of the four most-used modules bought separately.

Try the modules

Every module is in the beta.

The beta build includes all six modules and Core on a sample project. Import your own schedule and put the monitoring cycle through a real period.